Land Stewardship

Restoring the Land
with NRCS

Clearing brush, cutting firebreaks, and rebuilding native range across 505 acres — a five-year plan to leave El Chital Ranch healthier, safer, and wilder than we found it. El Chital Ranch is the neighboring 507-acre property to Rain Creek Ranch, serving as the grow-out range for young Axis bucks and the family's future homestead, with four generations planning to call it home.

The Challenge

Brush, Cactus, and Wildfire Risk

Left unmanaged, mesquite and prickly pear steadily close in on Hill Country range, crowding out native grasses and adding fuel to a landscape that already carries real wildfire risk. El Chital Ranch is running a deliberate, staged land-improvement program: clear the brush, cut the firebreaks, manage the debris, and reseed with native grasses.

Mesquite Canopy Today

42%

Mesquite Canopy Target

8%

Prickly Pear Coverage

~483 ac

Total Field Enrolled

505 ac

Hill Country wildfire risk is largely ember-driven: dry cedar, brush, and grass carry fire fast, and airborne embers — not just direct flame contact — are the primary way a wildfire reaches a structure. That risk sits close to home at El Chital: the four planned family house sites and the family camp all sit near the ranch entrance, inside the same landscape the brush is encroaching on.

The Work

A Four-Part Land Improvement Plan

01

Brush Management

Mesquite is removed mechanically — excavator power-grubbing — at four sites totaling 29 acres, bringing canopy cover from 42% down to an 8% target. Prickly pear is treated chemically via Individual Plant Treatment (MezaVue, Texas A&M AgriLife-approved) across nearly the entire 505-acre field — about 483 acres — staged over four years in expanding polygons.

02

Firebreaks

A network of bare-ground firebreaks, cleared to a 10-foot width, runs the full property perimeter and subdivides the interior into fire-management zones — nearly 30,000 linear feet across four segments. Extra defensible space is concentrated around the four house sites near the southern entrance.

03

Woody Residue Treatment

The same four mesquite-grubbing sites receive on-site retention with mechanical and manual control of slash, keeping cleared debris from becoming the next fuel load and undermining the firebreak work next to it.

04

Native Grass Restoration

Reclaimed ground is reseeded with nine warm-season native species confirmed with USDA-NRCS for McCulloch County range — including Little Bluestem, Sideoats Grama, Switchgrass, and Indiangrass — restoring forage value and holding soil.

The Execution

Equipment, Crews & Timeline

A closer look at how each practice actually gets done on the ground — the machinery, crew sizes, working rates, and estimated time required for this plan.

PracticeEquipment & CrewTypical RateEst. Time for This Plan
Mesquite Grubbing (Mechanical)Excavator (25–35k lb. class) with root rake/grubber attachment; skid steer for piling; 1 operator + 1–2 ground crew~1.5–2.5 acres/day per machine~12–18 working days for all 29 acres (4 sites)
Prickly Pear Individual Plant TreatmentUTV/ATV-mounted spray unit or backpack sprayers, MezaVue herbicide, PPE; 2-person applicator crew~8–12 acres/day per crew~8–12 days (2027) · ~14–20 days (2028) · ~10–15 days (2029) · ~9–14 days (2030)
Firebreak ConstructionTractor with offset disc, blade, or dedicated fireplow; ATV for layout/flagging; 1 operator + 1 support~1–2 miles/day, bare-ground standard~3–6 working days for all 29,989 ft. (~5.7 mi.)
Woody Residue TreatmentSkid steer with grapple, chainsaws; 2–3 person crew, typically follows the grubbing crew~1–1.5 acres/day per crew~1 additional week beyond grubbing, on the same 29 acres
Native Grass ReseedingTractor-pulled rangeland drill (or broadcast seeder + cultipacker); 1 operator~15–25 acres/day~1.5–2 days for the 29 reclaimed acres

Section III — The Timeline

The Plan, Year by Year

Staged deliberately across five years rather than attempted all at once — spreading cost, labor, and land disturbance while still reaching nearly the full 505-acre field. Total five-year contract: $66,672.

The Contract Begins

$4,000

A quiet first year — the Conservation Stewardship Program contract takes effect. No brush clearing, firebreak cutting, or residue treatment is scheduled yet; the ranch draws its annual Existing Activity Payment while heavier work is staged for 2027.

The Benefits

How the Work Improves the Land — For Cattle and Wildlife

The plan is deliberately staged rather than a clean sweep — a mosaic of open ground, scattered brush, and native grass supports far more species than either a solid thicket or a fully cleared pasture would.

Cattle

Primarily grass grazers — they benefit most directly from every acre of canopy and cactus removed. Mesquite competes with grass for soil moisture; prickly pear causes mouth, eye, and lameness injuries. Clearing both restores full use of the acreage.

Axis Deer

Predominantly grazers, closer to cattle in forage preference than native whitetail. Opening the mesquite canopy and clearing prickly pear directly expands the grass forage base Axis deer rely on, and the native bunchgrass being seeded is exactly what this breed does well on.

White-Tailed Deer

Browsers first, depending on brush and mast — a total clearing would work against them. That's why mesquite is held at an 8% canopy target instead of zero, and why brush piles and a mosaic of cleared/uncleared ground remain for browse and escape cover.

Turkeys & Bobwhite Quail

Turkeys need open, grassy ground for strutting and brood-rearing with an insect-rich understory. Quail need scattered low brush next to bunchgrass and bare ground for chicks — a close match for what this staged plan leaves behind.

A Federal Conservation Partnership

Independently Reviewed. Cost-Shared. Inspected.

This plan is carried out under an active USDA-NRCS Conservation Stewardship Program contract — a five-year whole-operation stewardship agreement, not a one-off grant. The application was independently scored through NRCS's ranking process and cleared the program's stewardship threshold before a dollar of funding was committed.

Coverage505.1 acres — Farm 3703, Tract 2361, McCulloch County, TX
TermEffective on NRCS approval through December 31, 2030
ProgramUSDA-NRCS Conservation Stewardship Program (CSP)
Planning SupportUSDA-NRCS Brady Service Center & McCulloch SWCD
Stewardship Threshold5 of 13 categories met at application → 9 of 13 projected by 2030
Practice LifespanBrush management: 10 years · Firebreaks: 5 years

"Leave the ranch stronger than it was received."

— Hill Country Axis Founding Principle

Work with your local NRCS field office

Applications are accepted year-round; funding is ranked and selected periodically.

Find Your Field Office